用户注册 登录
珍珠湾全球网 返回首页

岳东晓 -- 珍珠湾全球网 ... http://ydx.zzwave.com [收藏] [复制] [分享] [RSS] 岳东晓 -- 珍珠湾全球网

日志

INTEL in deep trouble

热度 1已有 9196 次阅读2020-12-19 04:58 |系统分类:转帖-科技

英特尔的问题是AMD的福音。 Wells Fargo upraded its PT to $120. GS upgraded it to $110. Barclays upgraded to $115.

https://www.notebookcheck.net/Tough-times-ahead-for-Intel-industry-insiders-spill-the-beans-on-subpar-10-nm-yields-server-CPU-plus-7-nm-delays-production-outsourcing-and-more.509532.0.html

Issues with the 10 nm node yields:

  • Base 10 nm production started in late 2018 has been improved in the meantime. Still does not appear viable for “full production” and “shipping for revenue” purposes.
  • Upcoming SuperFin 10 nm nodes are “unquestionably far better than base 10nm. Better in just about every way. Yields are better (50+%), but still not as good at the 14 nm nodes.
  • Cannon Lake (the first processors to be produced on the base 10 nm node launched 2 years ago) had yields lower than 25% even with iGPU disabled.
  • The 10 nm capacity is far from handling an entire product stack.
  • Even with SuperFin tech, the 10 nm production capacity may never match that of the 14 nm nodes.
  • Backporting the upcoming Rocket Lake processors was not a good move: the new models ended up too big and are expected to be power hogs.
  • 14nm shortage caused by the fact that Intel had to bloat up die sizes.
  • “OEMs told they were to get a "small fraction" of orders of TGL. Improvements to yield won't fully help because no. of wafer starts is still low.”

Server-grade Scalable Processor delays:

  • Ice Lake SP processors delayed again due to a bug. Release scheduled moved to mid-late Q2 or early Q3 2021. “Performance looks pretty poor. Akin to Comet Lake SP actually - performance per socket remains the same but power rises. Core count for shipping parts dropped from 38 -> 36.” Ice Lake is disappointing.

7 nm node delays:

  • “7 nm is significantly more delayed than the 6-12 months first claimed. Ponte Vecchio is in-hands basically now and it was the first 7 nm product. Now it's on TSMC. Sometime December this year anyway.”
  • The actual release schedule for the 7 nm products is still not clear

路过

鸡蛋
1

鲜花

支持

雷人

难过

搞笑

刚表态过的朋友 (1 人)

 

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 用户注册

Archiver|手机版|珍珠湾全球网

GMT+8, 2024-4-19 02:16 , Processed in 0.020966 second(s), 7 queries , Apc On.

Powered by Discuz! X2.5

回顶部